Trump Inaugurates Gorgeous New Airport Terminal! #MAGA #USA
| vigorous bipolar church building | 10/08/25 | | frozen peach rehab stain | 10/08/25 | | vigorous bipolar church building | 10/08/25 | | frozen peach rehab stain | 10/08/25 | | vigorous bipolar church building | 10/08/25 | | frozen peach rehab stain | 10/08/25 | | Mind-boggling adulterous dog poop | 10/08/25 | | vigorous bipolar church building | 10/08/25 | | Dashing Bawdyhouse | 10/08/25 | | frozen peach rehab stain | 10/08/25 | | aqua university masturbator | 10/08/25 | | vigorous bipolar church building | 10/08/25 | | aqua university masturbator | 10/08/25 | | vigorous bipolar church building | 10/08/25 | | aqua university masturbator | 10/08/25 | | vigorous bipolar church building | 10/08/25 | | vigorous bipolar church building | 10/08/25 | | frozen peach rehab stain | 10/08/25 |
Poast new message in this thread
 |
Date: October 8th, 2025 1:56 PM Author: vigorous bipolar church building
sounds decent but i do hate when they blow billions on new airports without doing the rail line at the same time, cambodia also furking just did this
Near Future: Shuttle buses from stations
Shuttle buses will soon operate between NMIA and nearby railway stations — Seawoods, Nerul, Belapur, and Targhar — making last-mile travel smoother. Commuters can currently reach Targhar Station via Harbour Line and switch to the Uran Line to get closer to the airport.
Future metro connectivity
The upcoming Metro Line 8 (Gold Line) will directly connect Mumbai Airport to Navi Mumbai Airport, expected to be completed by 2029. Additional Navi Mumbai metro extensions are also planned to link directly to NMIA, providing a seamless airport-to-airport travel experience.
Water taxi in the works
A water taxi service from Radio Club Jetty (Colaba) to a planned jetty near NMIA is also under consideration. The proposal, backed by the Maharashtra Maritime Board, aims to offer scenic and time-saving access from South Mumbai once feasibility approvals are cleared.
(http://www.autoadmit.com/thread.php?thread_id=5784366&forum_id=2\u0026hid=",#49334546)
|
Date: October 8th, 2025 2:17 PM Author: vigorous bipolar church building
jfc Modi Ji and Adani built entire thing in THREE furking years after shitlibs for two+ decades held it up
🚨 Navi Mumbai Airport Journey ✈️
>1997 – Project first conceived.
>1997–2021 – Stuck in files, nothing happened.
>2021 – Adani takes charge from GVK.
>2022 – L&T begins construction.
>2025 – Phase-1 inaugurated today!
(http://www.autoadmit.com/thread.php?thread_id=5784366&forum_id=2\u0026hid=",#49334626)
|
|
|